For small to mid-sized contractors, Sage 50 is often the accounting software of choice. It’s affordable, widely used, and handles general ledger, invoicing, payroll, and financial reporting reliably. However, when it comes to work-in-progress (WIP) reporting, Sage 50 shows its limits.
WIP reports are essential for running a healthy construction business. They serve as the financial heartbeat of your active jobs, showing:
- How much revenue you’ve actually earned
- How profitable each project is
- Whether you’re underbilling or overbilling
- If you’re on track to meet estimated margins
While Sage 50 provides good foundational data, it doesn’t give you WIP insights out of the box. That means construction finance teams must build their own WIP reports — often by exporting to Excel and manually piecing together data from various sources.
Let’s explore what a WIP report should include, the challenges of creating one in Sage 50, and how tools like PivotXL can help you streamline the entire process.
Why Work-in-Progress Reports Matter
Before diving into the software, it’s important to understand what a WIP report actually does. It’s not just a table — it’s a key decision-making tool used by finance teams, project managers, and executives to:
- Track job-level profitability: See how each project is performing in real time.
- Recognize revenue accurately: Stay compliant with ASC 606 by recognizing revenue based on performance, not billing.
- Manage cash flow: Identify underbilling and overbilling to improve working capital.
- Inform stakeholders: Provide updates to banks, bonding agents, or investors about project health.
- Spot issues early: Flag cost overruns, margin compression, or underperforming jobs before it’s too late.
For growing contractors, WIP reports are the backbone of project-level financial control. Unfortunately, Sage 50 doesn’t offer a native WIP reporting feature — so you’ll have to build it yourself or use a tool that simplifies it.
What a WIP Report Should Include
A complete WIP schedule typically includes the following columns:
Column | Description |
---|---|
Job Name / ID | Identifies the project |
Contract Value | Total value of the job |
Cost to Date | Actual costs incurred so far |
Estimated Cost to Complete | How much more it will take to finish |
Total Estimated Cost | Cost to date + cost to complete |
% Complete | Cost to date ÷ total estimated cost |
Earned Revenue | % complete × contract value |
Revenue Billed to Date | Total invoiced |
Over/Under Billing | Earned revenue – billed revenue |
Projected Gross Margin | Earned revenue – total estimated cost |
Sage 50 can generate some of this data — like total job costs and invoices — but you’ll need to do most of the WIP calculations manually in Excel.
Challenges of Building a WIP Report in Sage 50
While possible, creating a WIP schedule in Sage 50 has several drawbacks:
1. No Native Job Costing Module
Sage 50 isn’t built specifically for job-costed industries. You can track some project-level expenses using departments, classes, or sub-accounts — but it’s a workaround, not a true project accounting system.
2. Manual Data Gathering
To create a full WIP schedule, you must export:
- Trial balance or GL by job
- Invoices billed to date
- Actual labor, material, and subcontractor costs
- Change order adjustments
You’ll then reformat all this data in Excel. It’s labor-intensive and error-prone — especially when doing it every month.
3. No Real-Time Collaboration
Since everything lives in separate spreadsheets, project managers can’t easily contribute. Cost-to-complete estimates often require email chains or in-person updates that slow down month-end close.
4. Static Reports
Once your spreadsheet is built, it becomes a snapshot. It doesn’t update automatically, and every new billing cycle means another round of exporting, copying, and rechecking formulas.
How PivotXL Simplifies Sage 50 WIP Reporting
That’s where PivotXL comes in. It’s an Excel-based FP&A platform that connects directly to Sage 50 and transforms your month-end process.
✅ Direct Integration with Sage 50
PivotXL pulls trial balance and job-level data directly from Sage 50 into a centralized data cube
✅ Custom WIP Templates in Excel
Build templates in Excel with dynamic formulas, dropdowns, validations, and calculations like % complete, projected margin, and earned revenue — all auto-filled with live data.
✅ Cost-to-Complete Entry by PMs
Share templates with project managers so they can enter or approve their portion of the forecast (cost to complete). Their input flows back to the finance team instantly.
✅ Multi-Project Rollups
Instead of managing 10+ tabs for 10 projects, PivotXL allows you to roll up all WIP data into a consolidated view — by business unit, region, or job type.
✅ Real-Time Refresh
Each time Sage 50 updates, your WIP data is refreshed. You never have to copy-paste again.
✅ Profitability Trends and Analysis
Track job-level margins over time, flag underperforming projects, and compare profitability by customer or cost code. PivotXL helps you turn WIP from a compliance task into a strategic tool.
Conclusion: Sage 50 WIP Reporting Made Easy
Sage 50 is a reliable accounting tool — but it lacks the robust project financial management that contractors need for WIP reporting. Without native job costing or WIP schedules, many construction businesses are forced to rely on fragile, manual Excel workbooks.
With PivotXL, you get the best of both worlds:
- Stay in Excel, where you’re comfortable
- Get structured, real-time data from Sage 50
- Automate repetitive tasks
- Collaborate with your project team
- Improve visibility, accuracy, and decision-making
If you’re spending hours every month patching together WIP reports in Excel, it’s time to upgrade your process — not your whole ERP.